Skip to main content

Community

Other: HVR runs out of sync with database upgrade

Please sign in to leave a comment.

Comments

1 comment

  • Official comment
    Mark Van de Wiel User

    Hi Khosro,

    The sequence of steps that should result in no loss of changes:
    - Application stops on Oracle 12.2.
    - Make sure to capture and integrate all changes before the upgrade.
    - Stop the HVR scheduler.
    - Perform the database upgrade to 19c.
    - Update the Location Configuration to use the 19c Oracle home.
    - Activate (or initialize) the channel using Transaction Files and Capture Time, Table Enrollment and Scripts and Jobs. Use capture rewind time to a point after the upgrade, but before the application started processing on Oracle 19c.
    - Resume the replication.

    Hope this helps.

    Mark.