Refresh Job Progress Visibility Enhancement
Answered- Issue observed from customer tickets (last 3 months):
- Bulk refreshes in HVR are taking significantly longer than expected.
- Limited visibility into progress, bottlenecks, and estimated completion times.
- Customer impact:
- Difficulty planning maintenance windows and cutovers.
- Operational uncertainty during long-running refreshes.
- Delayed troubleshooting when performance degrades.
- Recommended improvements:
- Pre-refresh runtime estimation.
- Identification of large tables and bottlenecks.
- Timeprofiler option for Refresh
- Real-time progress, throughput, and more logging in the refresh log
- Refresh Bottleneck Analysis
- Visibility into whether delays originate from source reads, network transfer, or target loading.
- Actionable recommendations to improve performance.
- Historical Refresh Analytics
- Comparison with previous refresh executions.
- Expected Customer Benefits
- Greater predictability and operational confidence.
- Better planning for refresh activities.
- Faster identification of performance issues.
-
Hi Meghana,
To summarise your request:
- estimator for refresh. Real-time refresh progress (rows processed, rows remaining, throughput, phase) visible in the UI/API without requiring channel re-activation
- Database-native progress signals: surfacing row counts from target load statistics (COPY/INSERT progress, commit checkpoints) for databases like PostgreSQL, Oracle, and DB2
- refresh analytics vs previous
- Stuck vs. progressing detection: automatic differentiation between an actively loading refresh and one that has stalled (no row movement for N minutes). On this specific point, we do have additional alerting enhancements coming out in the next 6.3.5 release. Please validate how those work for you.
For point 2, we have a similar request, and we are looking into how we can improve the product. For point 4, check whether the latest alerting capabilities make a difference.
Still, I want to be transparent. These are significant, unplanned engineering efforts that touch multiple layers of the product. As a result, I do not expect we will be able to implement improvements quickly.
We will come back to you once we have more clarity on prioritization and possible timelines.
Best regards,
Edwin