Rocketlane Resource Allocation must include all future events
Which connector?: Rocketlane
Additional details: The current behavior when syncing Rocketlane Resource Allocations is to filter out events with a start date later than the current date.
In support ticket 386219 I explained that this logic is simply wrong. The sole purpose of Resource Allocations is to plan for future events. The filter on end_date should be removed such that all future events are included in the sync.
Please sign in to leave a comment.
Comments
0 comments