Connector Improvement: Schedules Features is not flexible enough
Plannedcurrently we can only set interval of 1,5, 15, 30 minutes
or 1,2,3,6,8,12 hourly
or once a day at a specific time, once set it's applicable to all tables.
Request #1: to have different schedules for some tables from the same source
Request #2: to have a more flexible schedule,
use case 1: start from 7am run every 3 hourly, till 3pm.
use case 2: run at specific time in the day: 3am, 6pm ,10am
use case 3: every 3 hours starts at 2am (currently this time cannot be set), thus the connector will run at every 2am, 5am, 8am,11am and so forth..
-
Official comment
Good idea, this has been a long requested feature, and we're looking at getting this on the roadmap for next quarter.
Eric
-
Thanks for looking into this.
For request #2, I have another case scenario, run weekly on some days (Mon-Fri)
- run Weekly (Saturday)
- run Monthly (any day of the month)
- run Monthly (Last Sunday of the month) - Nice to have (Low priority)
Please sign in to leave a comment.
Comments
2 comments