Transformations: Allow for integrated schedule for transformations "in code"
Adding transformations via UI is very tedious for large dbt projects and unmaintainable, but this is the only way to leverage integrated scheduling. Transformations in code should support integrated scheduling.
Please sign in to leave a comment.
Comments
0 comments