This procedure assumes that replication jobs are fully initialized, and capture time has been positioned before the start of the oldest open long running transaction on the source. The full load can be done for all tables in the channel or just for selected tables.
Instructions
This is the recommended procedure:
Open the refresh dialog
Select source and target location(s)
Select the tables that need to be refreshed
Select the level of parallelism for tables
The Online Refresh options need to be checked, and the option needs to be set to “Skip Previous Integrate”. This is because we assume two integrate locations (see here for explanation of the other options)
Check the Schedule box and chose a sensible name for the Refresh Task
Click Schedule
Suspend integrate jobs, but capture jobs can be left running
Optionally - Go on to the HVR Scheduler, select the refresh job that has just been created and chose “New Attribute”. Create a retry_max attribute and set this to the desired value. 0 means no retry.
Right mouse click the refresh job and chose start to kick off the job
Related articles
There is no content with the specified labels